造价通
更新时间:2024.04.27
雨水调蓄池设计

格式:pdf

大小:15KB

页数: 2页

Stormwater Management Pond Design Steps: 1. Feasibility study: Hydrology - Dry pond or wet pond? If receive and retain enough flow from rain, runoff, and groundwater to ensure long-term viability. Undrlying Soil - Underlying soils must be identified and tested. Soil permeability must be tested in the proposed Wet Pond location to ensure that excessive infiltration will not cause the WP to

《城镇雨水调蓄工程技术规范》解读

格式:pdf

大小:945KB

页数: 1页

《城镇雨水调蓄工程技术规范》解读

北京雨水调蓄相关专题

分类检索: